A used fiber laser priced against parts bought from a job shop, a credit line carrying steel for a customer that pays 60 days after invoice, a stretch wrapper and case sealer for a food producer, what a partner may review before a machine goes into an existing plant, and Wood County, OH manufacturing figures.
At a glance
- Manufacturing, Wood County, OH
170 employer establishments (CBP 2023)
- Paid employees in manufacturing
14,224, the most of any sector (CBP 2023)
- Annual manufacturing payroll
$979.03 million (CBP 2023)
- Manufacturing at a ZIP 43402 address
38 employer establishments (ZBP 2023)
Manufacturing equipment financing: a Wood County, OH fabrication shop weighs a used fiber laser against outsourced cut parts
Invented case: a fabrication shop in Wood County, OH sends its flat parts to a job shop for laser cutting and pays about $5,300 a month for the blanks. A used fiber laser is offered at $126,000. With $18,900 (15%) paid at signing, the remaining $107,100 goes on equipment financing over 60 months at a 10.8% annual rate.
In this invented example each payment is $2,317.95, and the 60 of them total $139,077.00, so the financed amount carries $31,977.00 of interest. Set against the $5,300 the shop now spends, the payment leaves $2,982.05 a month for the operator's hours, power, assist gas, nozzles and service. If those come to more than that, buying blanks stays the cheaper route; if they come to less, the laser pays for itself inside the term.
A laser of this size needs a heavy electrical circuit and an assist-gas supply. The machine is the financed item; the electrical service and any gas piping are property work outside this site.
Credit line uses for Wood County, OH manufacturers carrying net-60 customer invoices
In an invented example, a Bowling Green, OH manufacturer wins a monthly order from a customer that pays 60 days after each invoice. Steel for each month's run costs $14,800 and is bought on the first of the month; the parts ship and are invoiced on day 25, and the customer pays on day 85.
Still in the invented case, drawn from a business line of credit at 13.15%, each $14,800 draw is out for 85 days and carries $453.22 of simple interest. Because the second month's steel is bought on day 31, before the first invoice is paid, the balance reaches $29,600 between day 31 and day 85. From then on, each customer payment clears one draw as the next one starts, so the line holds two months of steel for as long as the order runs.
When the material is the main cost and the orders are large, inventory financing is another way to carry it.
A stretch wrapper and case sealer at the end of a Bowling Green, OH food producer's line
Invented case: a small food producer packs cases and wraps pallets by hand. A semi-automatic stretch wrapper costs $11,950 and a case sealer $4,380, $16,330 together. Over 48 months at 12.15%, the pair comes to $431.24 a month; the full run of payments is $20,699.52, including $4,369.52 of interest.
Stretch film and tape are running costs paid from sales, not part of the equipment agreement. Both machines plug into ordinary outlets and an air line already in the plant; adding a circuit or air piping would be property work outside this site.
What a funding partner may review before a Bowling Green, OH manufacturer adds a machine inside its plant
A request for a production machine can include more paperwork than one for a small tool. A partner may ask for:
- the quote, with the make, model, year and hours of a used machine, and who delivers and sets it in place
- the customer orders or contracts the machine is meant to serve
- recent business bank statements, time in business and any debt already on the equipment
- what the machine needs from the building: power, air, a foundation
An addition to the building, a new foundation or a power upgrade is property work outside this site. The machine, its tooling and the material to run it are what a request can cover. A business term loan can carry a cost spread over several years that is not tied to one machine.
Wood County, OH manufacturing payroll, plant sizes and selected subsectors
Manufacturing had 170 employer establishments in Wood County, OH in 2023 (County Business Patterns, NAICS 31-33). With 14,224 paid employees, it had more people on payroll than any other sector, and its $979.03 million in annual payroll was also the largest. Plants under five employees were the exception, at 21.2% of the 170.
| Subsector (NAICS) | Employer establishments | Paid employees | Fewer than 5 employees |
|---|---|---|---|
| Fabricated metal product manufacturing (332) | 32 | 1,119 | 4 (12.5%) |
| Printing and related support activities (323) | 12 | 261 | 8 (66.7%) |
| Food manufacturing (311) | 10 | 497 | 3 (30.0%) |
In the 2023 ZIP-level file, 38 manufacturing establishments had a ZIP 43402 address, and 10.5% of those had fewer than five employees.
Nonemployer Statistics, a separate program, counted 113 manufacturing businesses with no paid employees in the county for 2024. The industries page has a short note on a portable measuring arm, and the Bowling Green, OH page sets manufacturing beside the other sectors.
By Sandpark Lenders · Updated